KINYONA – GATURA – NJABINI ROAD (B20)

Kenya National Highways Authority (KeNHA)

DESIGN REVIEW AND CONSTRUCTION SUPERVISION OF KINYONA – GATURA – NJABINI ROAD (B20) PART OF THE MAU MAU ROAD NET WORK

kinyona

KeNHA

  • Kenya National Highways Authority (KeNHA)
  • www.kenha.co.ke
  • 68.8 Kilometers

DURATION OF ASSIGNMENT: 54 Months for Design Review, Supervision and Defects Liability Period.
SCOPE OF CONSTRUCTION WORKS: The scope of the Works entails new construction to bitumen standard of 68.8 km of a two-lane two-way single carriageway road with shoulders on each side. Other works are construction of drainage structures, reinforced concrete box culverts, concrete pipe culverts and storm-water drainage outfalls. Within the town centers the works include construction of Non-Motorized Traffic facilities, covered U-drains and street lighting.