: DESIGN REVIEW AND CONSTRUCTION
SUPERVISION FOR UPGRADING/ CONSTRUCTION OF UPLANDS
– GITHUNGURI – RUIRU (C560) ROAD
KeNHA
Kenya National Highways Authority (KeNHA)
www.kenha.co.ke
46 Kilometers
54 Months for Design Review, Supervision and Defects Liability Period. SCOPE OF CONSTRUCTION WORKS: The scope of the works entaied rehabilitation of 46km of the existing road to a two-lane two-way single carriageway bituminized road with shoulders on each side. Other works were construction of drainage structures, reinforced concrete box culverts, concrete pipe culverts and storm-water drainage outfalls. Within the town centers the works included construction of Non-Motorized Traffic facilities, covered U-drains and street lighting