DESIGN REVIEW AND CONSTRUCTION SUPERVISION OF KINYONA – GATURA – NJABINI ROAD (B20)
PART OF THE MAU MAU ROAD NET WORK
KeNHA
Kenya National Highways Authority (KeNHA)
www.kenha.co.ke
68.8 Kilometers
DURATION OF ASSIGNMENT: 54 Months for Design Review, Supervision and Defects Liability Period. SCOPE OF CONSTRUCTIONWORKS: The scope of the Works entails new construction to bitumen standard of 68.8 km of a two-lane two-way single carriageway road with shoulders on each side. Other works are construction of drainage structures, reinforced concrete box culverts, concrete pipe culverts and storm-water drainage outfalls. Within the town centers the works include construction of Non-Motorized Traffic facilities, covered U-drains and street lighting.